Al-Hartha wastewater treatment plant

A wastewater treatment plant in Al-Hartha, Basra Governorate, with a capacity of 16,000 m³/day.

  • 16,000 m³/dayTotal capacity
  • 656 m³/hFlow rate
  • 9 unitsTreatment units at the plant

Overview

Location
Al-Hartha, Basra Governorate
Contracting party
General Trading & Contracting Integrated Company
Plant type
Wastewater treatment
Process
Sedimentation and aeration, disinfection, odor removal by biofilter

What this reference shows

A plant with two lift stages and treatment by sedimentation, aeration and disinfection, with odor removal by biofilter and sludge treatment by thickening and dewatering.

Aerial view of the plant’s circular tanks.
Aerial view of the plant’s circular tanks.

Treatment chain

From the lift station to disinfection

  1. Pre-lift station
  2. Lift station
  3. Screening
  4. Grit and oil chamber
  5. Sedimentation and aeration
  6. Disinfection

Other units at the plant

  • Odor removal system with a biofilter.
  • Sludge thickener and recirculation tank.
  • Sludge dewatering unit.

Request a study or proposal

Start with your project data.

Send us your project data. Our technical team reviews it and comes back with the right next step: a preliminary study, or a technical and commercial proposal.

Data that helps us prepare the proposal

  • The water source and a recent analysis of it.
  • The required capacity and its unit: m³/day or m³/h.
  • The required product-water or effluent quality.
  • The project site, available area and power source.
  • The scope required: study, supply, or full execution.
  • The expected project schedule.