Technical reference — Basra
Al-Midaina wastewater treatment plant
A biological treatment plant using MBBR in Basra Governorate, with a polishing basin and UV disinfection.
- 10,000 m³/dayNominal capacity
- 10,178 m³/dayCapacity in the design data
- 424 m³/hFlow rate
Overview

- Location
- Basra Governorate, Iraq
- Contracting party
- Al-Babeal Company
- Influent
- BOD 240, COD 350, suspended solids 150 ppm
- Effluent design values
- BOD below 40, COD below 80, suspended solids not above 60 ppm
- Process
- MBBR with bioreactors, a polishing basin, UV disinfection
What this reference shows
Biological treatment by MBBR on a compact site, followed by polishing and UV disinfection, with units for sludge storage and dewatering.
Treatment chain
Treatment chain and units
- Equalization basin and pumping station
- ScreeningMechanical and manual
- Grit removalVortex chamber
- Biological treatmentMBBR
- Polishing basin
- DisinfectionUltraviolet
Sludge is treated in storage and dewatering units.
Plant units
| Unit | No. | Main data |
|---|---|---|
| Equalization basin | 1 | 16 × 21 m; water depth 1.7 m; average retention time 1.34 hours |
| Equalization pumps | 3 (2+1) | 325 m³/h per pump; discharge head 12 m |
| Screening unit | 2 | One mechanical and one manual screen; 30 mm opening; 1.0 m wide |
| Grit chamber | 1 | Diameter 3.0 m; height 3.5 m; time 25 s |
| MBBR basins | 2 | 14.5 × 20 m; water depth 4.0 m |
| Bioreactors | 32 | Reactor diameter 1.1 m |
| Air blowers | 3 (2+1) | 3,500 Nm³/h per blower |
| Polishing basin | 1 | 3.5 × 29 m; height 3.0 m |
| Disinfection unit | 1 | UV lamps; channel width 655 mm |
Other projects and references
See other work
Technical reference — BasraAl-Abbas drinking water treatment plant
Conventional surface-water treatment plant in Basra with a total capacity of 130,000 m³/day.
View project
Technical reference — BasraAl-Qurna wastewater treatment plant
Biological treatment plant for Al-Qurna district using MBBR and a bioreactor. Nominal capacity 35,000 m³/day.
View project
Technical reference — BasraAl-Hartha wastewater treatment plant
A plant with two lift stages and treatment by sedimentation, aeration and disinfection, with odor removal. Capacity 16,000 m³/day.
View projectRequest a study or proposal
Start with your project data.
Send us your project data. Our technical team reviews it and comes back with the right next step: a preliminary study, or a technical and commercial proposal.
Data that helps us prepare the proposal
- The water source and a recent analysis of it.
- The required capacity and its unit: m³/day or m³/h.
- The required product-water or effluent quality.
- The project site, available area and power source.
- The scope required: study, supply, or full execution.
- The expected project schedule.