Technical reference — Basra
Al-Qurna wastewater treatment plant
A biological treatment plant for Al-Qurna district, north of Basra, using MBBR and a bioreactor, for the Basra Sewerage Directorate.
- 35,000 m³/dayNominal capacity
- 35,400 m³/dayCapacity in the design data
- 1,475 m³/hFlow rate
Overview
- Location
- Al-Qurna district, Basra Governorate, Iraq
- Beneficiary
- Basra Sewerage Directorate
- Influent
- BOD 250–370, COD 350–550 ppm
- Effluent design values
- BOD below 20, COD below 100
- Process
- MBBR basin with a bioreactor (Turbo Reactor), sedimentation, disinfection
- Structural works
- Reinforcement, the screening unit, the electrical and control building, the workshop building
What this reference shows
A biological treatment plant sized to serve a whole district, combining an MBBR basin and a bioreactor with sedimentation, disinfection and sludge treatment, together with its electrical, control and workshop buildings.

Treatment chain
Treatment chain and plant units
- Distribution chamber
- Screening
- Grit and oil chamber
- Equalization basin
- MBBR basin
- BioreactorTurbo Reactor
- Sedimentation and transfer pumps
- Disinfection
Plant units
- Distribution chamber.
- Screening unit.
- Grit, scum and oil chamber.
- Equalization basin.
- Biological treatment unit: MBBR basin and bioreactor.
- Sedimentation basin and transfer pumps.
- Flow measurement unit.
- Disinfection unit.
- Gravity sludge storage and dewatering unit.
Other projects and references
See other work
Technical reference — BasraAl-Abbas drinking water treatment plant
Conventional surface-water treatment plant in Basra with a total capacity of 130,000 m³/day.
View project
Technical reference — BasraAl-Midaina wastewater treatment plant
Biological treatment by MBBR with a polishing basin and UV disinfection. Nominal capacity 10,000 m³/day.
View project
Technical reference — BasraAl-Hartha wastewater treatment plant
A plant with two lift stages and treatment by sedimentation, aeration and disinfection, with odor removal. Capacity 16,000 m³/day.
View projectRequest a study or proposal
Start with your project data.
Send us your project data. Our technical team reviews it and comes back with the right next step: a preliminary study, or a technical and commercial proposal.
Data that helps us prepare the proposal
- The water source and a recent analysis of it.
- The required capacity and its unit: m³/day or m³/h.
- The required product-water or effluent quality.
- The project site, available area and power source.
- The scope required: study, supply, or full execution.
- The expected project schedule.