Technical reference — Basra

Al-Qurna wastewater treatment plant

A biological treatment plant for Al-Qurna district, north of Basra, using MBBR and a bioreactor, for the Basra Sewerage Directorate.

  • 35,000 m³/dayNominal capacity
  • 35,400 m³/dayCapacity in the design data
  • 1,475 m³/hFlow rate

Overview

Location
Al-Qurna district, Basra Governorate, Iraq
Beneficiary
Basra Sewerage Directorate
Influent
BOD 250–370, COD 350–550 ppm
Effluent design values
BOD below 20, COD below 100
Process
MBBR basin with a bioreactor (Turbo Reactor), sedimentation, disinfection
Structural works
Reinforcement, the screening unit, the electrical and control building, the workshop building

What this reference shows

A biological treatment plant sized to serve a whole district, combining an MBBR basin and a bioreactor with sedimentation, disinfection and sludge treatment, together with its electrical, control and workshop buildings.

Reinforcement works on the plant site at night.
Reinforcement works on the plant site at night.

Treatment chain

Treatment chain and plant units

  1. Distribution chamber
  2. Screening
  3. Grit and oil chamber
  4. Equalization basin
  5. MBBR basin
  6. BioreactorTurbo Reactor
  7. Sedimentation and transfer pumps
  8. Disinfection

Plant units

  • Distribution chamber.
  • Screening unit.
  • Grit, scum and oil chamber.
  • Equalization basin.
  • Biological treatment unit: MBBR basin and bioreactor.
  • Sedimentation basin and transfer pumps.
  • Flow measurement unit.
  • Disinfection unit.
  • Gravity sludge storage and dewatering unit.

Request a study or proposal

Start with your project data.

Send us your project data. Our technical team reviews it and comes back with the right next step: a preliminary study, or a technical and commercial proposal.

Data that helps us prepare the proposal

  • The water source and a recent analysis of it.
  • The required capacity and its unit: m³/day or m³/h.
  • The required product-water or effluent quality.
  • The project site, available area and power source.
  • The scope required: study, supply, or full execution.
  • The expected project schedule.