In October 2026 the Government Contracts Department of Basra Governorate issued two “confirmation of similar works” letters to Handasat Al-Mualaja General Contracting Company, confirming the 100% completion of two projects in the water sector.
- 2 projectsIn the water sector
- 100%Completion of each
- October 2026Date of the two letters
Overview
1. Compact water unit — Nahr Al-Izz, Izz al-Din Salim sub-district
- Project
- Outstanding works of the project to supply and install a compact water unit, capacity 200 m³ (as written in the letter), for the Bait Sa’eed and Al-Awaji communities / Nahr Al-Izz — Izz al-Din Salim sub-district
- Tender
- 3/Water/2024
- Confirming authority
- Basra Governorate — Government Contracts Department, based on a letter from the Project Management Department / Water Section
- Final acceptance
- 6 January 2026
- Completion
- 100%
2. Water pipeline, Sayyid Al-Shuhada area — Al-Hartha district
- Project
- Construction of a water pipeline in the Sayyid Al-Shuhada area / Al-Hartha district
- Tender
- 22/Water/2025
- Confirming authority
- Basra Governorate — Government Contracts Department, based on a letter from the Project Management Department / Water Section
- Final acceptance
- 28 February 2026
- Completion
- 100%
Copies of the letters
The company provides copies of the two confirmation letters to interested parties on request.
Other projects and references
See other work
Execution contractWastewater and stormwater stations — Izz al-Din Salim
Mechanical and electrical works for the wastewater and stormwater stations; 75-day duration.
View project
SubcontractorShalamcheh–Basra railway bridge over the Shatt al-Arab
Subcontractor on the railway bridge over the Shatt al-Arab, part of the Iraq–Iran rail link.
View project
RehabilitationRehabilitation of the Al-Sharash water complexes
Rehabilitation of 6 water complexes and 81 km of HDPE pipe laid in 7 networks.
View projectRequest a study or proposal
Start with your project data.
Send us your project data. Our technical team reviews it and comes back with the right next step: a preliminary study, or a technical and commercial proposal.
Data that helps us prepare the proposal
- The water source and a recent analysis of it.
- The required capacity and its unit: m³/day or m³/h.
- The required product-water or effluent quality.
- The project site, available area and power source.
- The scope required: study, supply, or full execution.
- The expected project schedule.