Execution contract
Wastewater and stormwater stations — Izz al-Din Salim
Execution contract for the mechanical and electrical works of the wastewater (sewage) and stormwater stations in Izz al-Din Salim sub-district, Basra Governorate.
- 75 daysDuration of the works
- 2 stationsWastewater and stormwater
- Mechanical & electricalScope of the execution contract
Scope of work
Mechanical and electrical works
Mechanical works
- Fabrication of piping systems and headers from high-density polyethylene (HDPE) pipe to the specified dimensions, diameters and specifications.
- Installation of the systems on site at both stations.
- Installation of submersible pumps, gates, screens and overhead cranes.
- Connection of the system to the main transmission lines.
Electrical works
- Installation of the main panel and sub-panels.
- Installation of main and branch circuit breakers and the automatic transfer switch (ATS).
- Cable laying and termination between the sub-panels, the main panel, the generators and the main transformer.
- Installation of float switches and their connection to the control panels.
Other projects and references
See other work
SubcontractorShalamcheh–Basra railway bridge over the Shatt al-Arab
Subcontractor on the railway bridge over the Shatt al-Arab, part of the Iraq–Iran rail link.
View project
RehabilitationRehabilitation of the Al-Sharash water complexes
Rehabilitation of 6 water complexes and 81 km of HDPE pipe laid in 7 networks.
View project
Technical reference — BasraAl-Abbas drinking water treatment plant
Conventional surface-water treatment plant in Basra with a total capacity of 130,000 m³/day.
View projectRequest a study or proposal
Start with your project data.
Send us your project data. Our technical team reviews it and comes back with the right next step: a preliminary study, or a technical and commercial proposal.
Data that helps us prepare the proposal
- The water source and a recent analysis of it.
- The required capacity and its unit: m³/day or m³/h.
- The required product-water or effluent quality.
- The project site, available area and power source.
- The scope required: study, supply, or full execution.
- The expected project schedule.