Execution contract

Wastewater and stormwater stations — Izz al-Din Salim

Execution contract for the mechanical and electrical works of the wastewater (sewage) and stormwater stations in Izz al-Din Salim sub-district, Basra Governorate.

  • 75 daysDuration of the works
  • 2 stationsWastewater and stormwater
  • Mechanical & electricalScope of the execution contract

Scope of work

Mechanical and electrical works

Mechanical works

  • Fabrication of piping systems and headers from high-density polyethylene (HDPE) pipe to the specified dimensions, diameters and specifications.
  • Installation of the systems on site at both stations.
  • Installation of submersible pumps, gates, screens and overhead cranes.
  • Connection of the system to the main transmission lines.

Electrical works

  • Installation of the main panel and sub-panels.
  • Installation of main and branch circuit breakers and the automatic transfer switch (ATS).
  • Cable laying and termination between the sub-panels, the main panel, the generators and the main transformer.
  • Installation of float switches and their connection to the control panels.

Request a study or proposal

Start with your project data.

Send us your project data. Our technical team reviews it and comes back with the right next step: a preliminary study, or a technical and commercial proposal.

Data that helps us prepare the proposal

  • The water source and a recent analysis of it.
  • The required capacity and its unit: m³/day or m³/h.
  • The required product-water or effluent quality.
  • The project site, available area and power source.
  • The scope required: study, supply, or full execution.
  • The expected project schedule.